Skip to content

QA ​

Every fixture is inspected before it ships. QA starts on the last day of manufacturing, takes 1 business day, and ends with your approval to ship.

What we check ​

  • A fixture-specific checklist, built from your design: probe placement, hold-down, locating, fixture options and accessories.
  • Continuity checks, matched to the interface. We check each probe to its receptacle, wire, connector pin or TPCB net.
  • Photos of every unit: front, back, top, isometric, and open and closed.

If something fails, the fixture goes back for rework and is inspected again. Every finding and its fix is recorded.

QA review ​

When every unit has passed inspection, we send a QA Review with each unit's checklist results, photos and any open findings.

  • Approve within 1 business day to authorize shipping. This is your approval to ship.
  • Request changes with notes if something needs attention. We rework the fixture and send the review again.

We don't ship a fixture until you approve its QA review.

What happens next ​

After you approve, the order moves to shipping.